Pakistan Nuclear Regulatory Authority (PNRA) has issued Construction License to Pakistan Atomic Energy Commission (PAEC) for Chashma Nuclear Power Plant Unit 5 (C-5), on Friday. PAEC applied for the construction license in April this year along with the Preliminary Safety Assessment Report (PSAR) and other licensing submissions covering design and operational aspects of nuclear safety, radiation protection, emergency preparedness, waste management and nuclear security. After a thorough review and assessment of the licensing submissions and on satisfactory fulfillment of all regulatory requirements in compliance with the relevant national and international standards, PNRA issued the license. According to the PNRA, C-5 is an advanced third-generation Pressurized Water Reactor (PWR) of Chinese Hualong design (HPR1000) having active and passive safety features including a double-shell containment and reactor filtered venting system, and has a 60 years design life. In addition, a number of other technological innovations have been made in the design.
متعلقہ مضامین
-
Kaleem Imam removed, govt proposes three names for new IG
-
Rail Rush: The Adventure Puzzle Game
-
کڑک در زبان و موسيقی اورل
-
کڑک: مہمگے ۇلد۔
-
“کڑک”
-
کڑکیں کے کچھ اورہتے ہیں
-
کڑک: میراثی و فرهنگीय میراع
-
کڑک: یہ ایک عظیم کھانے کی ابروس ہے
-
کڑک: ایک شبیهای عادی کی تقلب
-
کطس کے بہتارۂ
-
نقدی پھٹنا: تآزميرہ و تجدد در ادبیات ما بعدیت
-
نقدی پھٹنا: جہاز معمرات اور اخلاقی نئیبند